Day 143

More stuff happening all over….

Day143_1

Kitchen cabinets and island going in. Most of what’s the exterior will be covered by doors and finish lumber, but that’s what the inside of the cabinets will look like. (The floor tile is 3′ x 3′ squares, for scale).

Day143_2

Hardwood floors are in, and some baseboard. The flooring is birch, 5″ wide. Birch is a bit softer than maple or oak; but bedrooms are pretty low traffic areas, so it will work well. Besides, the price of maple is really insane these days.

Day143_3

Rock being installed outside. There will be grout between the stones, once they’re installed.

Day143_4

Speaking of grout: bathroom tile is all complete and grouted – just needs the glass shower wall and door.